””””YANGON, Nov. 18 (Xinhuanet) -- The China CAMC Engineering Co. Ltd and the
Public Works (PW) under the Myanmar Ministry of Construction signed a contract
here Monday on building Myanmar's Mandalay Ayeyawady River Bridge (Yadanabon) by
the Chinese company.
””””On behalf of the respective sides, President of the Chinese company Luo Yan
and PW Managing Director U Nay Soe Naing signed the document.
””””Present at the signing ceremony were Chinese Ambassador to Myanmar Li
Jinjun, Economic and Commercial Counselor Jin Honggen and Myanmar Minister of
Construction Major-General Saw Tun.
””””The four-lane river-crossing highway bridge will be located on the
Ayeyawady River in Mandalay in the central part of the country,with its main
bridge extending 1,126 meters and its largest span being 224 meters.
””””Under the contract, the Chinese side will be responsible for the bridge's
design, equipment supply and technical supervision, while the Myanmar side for
the civil construction. The building ofthe bridge is set to complete in two and
a half years.
””””The bridge is an important transport construction project of Myanmar
crossing the country's Ayeyawady river and standing as an important link
connecting Mandalay and Sagaing areas.
””””On completion, the bridge will promote Myanmar's socio-economicdevelopment
and will become a symbolic construction building of Mandalay with shining beauty
added to the second largest city of the country.
””””The project is the sixth major one of its kind contracted by the Chinese
company since it entered the Myanmar market in 1995. Before this, it had built
and completed five major bridges for thecountry, namely the Myitkyina bridge
(Bala Mintin), Maubin bridge,Nyaungdon bridge (Bo Myat Tun), Ayeyawady bridge
(Magway) and Ayeyawady bridge (Dedaye). Enditem
””””